top of page

INGENIERÍA

INGENIERÍA DIMENSIONAL

Ingeniería Inversa

Bombas Warman

Lifting the key parts in an old equipment, for its manufacture

Metro de Santiago

Renew the Vía appliances, performing a Reengineering.

Ingeniería 

Minera Spence

Installation of dust collectors, in the building of the Secondary Crusher

Ingeniería Inversa

Minera Escondida

Renew the Vía appliances, performing a Reengineering.

INGENIERÍA INVERSA

Thickener harrows

Following an accident occurred in the thickener 22 Minera Escondida, it was necessary to re-manufacture the harrows, instance in which the client took advantage of generating a zero-time evaluation of the equipment, generating a model and manufacturing plans for the whole. Later, almost a year later, a laser scan was performed on the thickener 21, performing the same activity, that is, generating a 3D model and manufacturing plans for the structures and components and equipment. Then the information of both works was merged and a unified one was created to have the set of thickeners 21 and 22.

Martes 26 de Septiembre 2017

OMSERV

Ingeniería Inversa

bottom of page