top of page

INGENIERÍA

INGENIERÍA DIMENSIONAL

Ingeniería Inversa

Bombas Warman

Lifting the key parts in an old equipment, for its manufacture

Metro de Santiago

Renew the Vía appliances, performing a Reengineering.

Ingeniería 

Minera Spence

Installation of dust collectors, in the building of the Secondary Crusher

Ingeniería Inversa

Minera Escondida

Renew the Vía appliances, performing a Reengineering.

INGENIERÍA INVERSA

Road Appliances

According to the need to renew the technology of track devices, Metro de Santiago instructs Omega Services to carry out a reengineering of these parts that are manufactured by casting and redesign them to adapt them to mechanically welded technology. This commission posed the great challenge of integrating two construction systems in scenario of high contingency such as the circulation of Santiago Metro trains, achieving as a result a product that delivers a high impact solution to a problem of high complexity such as It was this approach 

Martes 26 de Septiembre 2017

OMSERV

Ingeniería Inversa

bottom of page